BREEAM Case Study - British Red Cross - BREEAM Very Good
[edit] Project information
- Client: British Red Cross
- Design Team: Sursham Tompkins, Tompkins Robinson Surveyors,
- Main Contractor: Borras Construction
- Sustainability Consultant: Encon Associates
- Project Title: British Red Cross Resource Centre, Chelmsford
- Value: £1.25m
- Services Provided by Encon Associates: BREEAM Assessment 2011 New Construction Offices
- Rating: Very good
- Stage: Design stage
[edit] Design stage assessment
The design stage assessment, also called the interim stage, provides evidence of the building’s performance at the design stage of the buildings life cycle. Assessment and certification ideally occurs prior to the beginning of operations on site. The certified BREEAM rating at this stage is labelled as ‘interim’ because it does not represent the building’s final, new construction BREEAM performance.
To be able to complete an assessment at this stage the design must be advanced to a point that the relevant design information is available to enable the BREEAM Assessor to evaluate and verify the building’s performance against the criteria defined in this scheme document. The interim design stage assessment will therefore be completed and certified at the scheme design or detailed design stages.
Having worked closely with the design team throughout this project, the target of BREEAM Very Good for design stage is now complete, achieving it's required Very Good comfortably.
The ground floor includes a reception, training room, staff office and breakout room with a large open plan office, meeting room and hot desk area on the first floor. Externally, a new pedestrian walkway from the main road to the building was created along with a car park and new boundary walls.
[edit] Project management
With over 10 years of experience working in BREEAM and sustainable construction, Encon Associates implement the use of IES TaP into all schemes appointed for BREEAM assessment. This is an award winning software that allows Encon to easily manage the process and ensure transparency and personnel allocation to all credits targeted. Managing the project via IES TaP BREEAM software, has allowed all parties involved to have a live update on progress at all stages of the project.
For more info on IES TaP for BREEAM, click here: IES TaP for BREEAM Website
For more info on BREEAM Assessors Encon Associates, click here: Encon Associates Website
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.